Part 1: turn a total fee into a calculation
A processing quotation can look like a single number: CNY 35 per garment. To understand it, separate the work included, the time assumptions and the rates used. This first article explains an illustrative CNY 21.3 labor calculation; Part 2 turns that understanding into five questions for comparing offers.
The figures below come from the supplied costing example. They are not independently timed factory results, statutory wage rates or a current market benchmark for an ordinary T-shirt. “Real” in the title refers to the practical costing approach, not a verified production time study.
How the CNY 21.3 labor total is calculated
For each operation group, multiply allocated minutes per garment by the stated labor rate. Add the results. This example assigns 54 minutes across preparation, sewing, ironing and packing. Do not assume those minutes apply to another style or production system.
Marker making and cutting often serve a batch. Their time must be allocated to pieces on a stated basis rather than charging the entire batch activity to every garment. Likewise, distinguish sewing labor minutes from the elapsed time one garment spends moving through a factory.
Working-minute costing is an established approach, but the meaning of the minute cost and the time basis must be explicit. A fully loaded factory minute rate is not the same as direct wages alone. [1]
| Operation group | Allocated time / garment | Example labor rate | Labor subtotal |
|---|---|---|---|
| Preparation: marker allocation, cutting, pre-pressing | 15 min | CNY 0.50/min | CNY 7.50 |
| Sewing | 30 min | CNY 0.40/min | CNY 12.00 |
| Ironing | 5 min | CNY 0.20/min | CNY 1.00 |
| Packing labor | 4 min | CNY 0.20/min | CNY 0.80 |
| Total | 54 min | Different rates by group | CNY 21.30 |
Why the quotation can exceed the labor subtotal
The arithmetic is 7.5 + 12 + 1 + 0.8 = CNY 21.3. Against that example, a CNY 25–35 quotation leaves CNY 3.7–13.7 above the stated labor subtotal. That difference is not automatically excessive, and the range is not automatically reasonable for every T-shirt.
A quote may also cover indirect labor, supervision, utilities, depreciation, quality checks, packing materials, overhead and profit. Ask which are already included in each rate so they are not counted twice. Fabric waste is a material-cost issue: it should only be included here if the agreed scope makes it the processor’s responsibility.
Confirm whether the offer is a processing-only charge, a cut-make-trim scope or a complete garment price. These terms are not used identically by every supplier. Write down responsibility for fabric, trims, labels, transport, taxes and subcontracted decoration.
What the minute rates actually mean
The example uses CNY 0.5 per minute for preparation, 0.4 for sewing and 0.2 each for ironing and packing. These are example costing inputs, not a regional wage schedule or a rule that preparation always deserves a higher rate.
Equipment, skill, staffing and cost allocation can differ between departments. Sewing can also require complex equipment and specialist handling; it is not inherently the simpler or cheaper activity. A hand-sewing rate of CNY 0.3 per minute appeared in the supplied example, but no hand-sewing time is included in the CNY 21.3 total.
Ask whether the time is standard allowed time, observed time or an efficiency-adjusted estimate. If efficiency is applied separately, understand the denominator. If it is already reflected in an effective minute rate, applying it again would duplicate the adjustment.
Embroidery needs a clearly stated pricing unit
Adding a logo changes the specification, but do not assume embroidery has one universal per-stitch tariff. Suppliers may quote per thousand stitches, per design, per piece or through a quantity matrix with separate setup and digitizing charges.
The supplied draft used CNY 0.2 per stitch. Read literally, 8,000 stitches would equal CNY 1,600, but no evidence established that unit as an actual applicable tariff. We therefore do not present it as a market rate or use it to claim a 76-fold cost increase. Ask the supplier to confirm the unit in writing.
Stitch count matters alongside order quantity, design size, colors, trims, hooping, location and setup. Wilcom’s pricing guidance explicitly accounts for several of these factors. A per-piece embroidery offer can be transparent when it names the design, size, stitch estimate, quantity and inclusions. [2]
Four reasons a processing quotation can rise
More operations. Extra seams, pockets, decoration and handling can add time and setup, but they do not automatically double labor. Compare the revised operation list.
Tighter requirements. Difficult materials, precise alignment, seam specifications and inspection demands can change time and rework allowances. Use operation-specific estimates rather than assigning the slowest operation’s rate to every step.
Smaller batches. Pattern work, setup, trial runs and line learning may be spread across fewer pieces. Confirm which fees are one-time and which recur.
Rush timing. Overtime, extra coordination or changed scheduling can create costs. Ask what actually changes and agree on the premium; a rush label alone does not justify an unspecified charge.
Why factories arrive at different numbers
Worker experience, methods, machinery, realistic efficiency and order mix can all affect costing. Automation may save labor on one step while adding depreciation or setup elsewhere. There is no fixed headcount saving that applies to every automatic cutting system.
Quality management and rework assumptions matter too. Ask who pays for correcting nonconforming work and how approvals are recorded. Do not infer that a low quote means a factory intends to charge for rework later.
A small-order specialist and a bulk producer may have different strengths and allocation methods. Neither is always more expensive. Compare the same style, quantity, quality requirement and delivery scope.
What to request before you accept
Ask: “Please break the processing fee down by operation group, with the time basis and rate where available. Please also state pattern revision charges, embroidery pricing units, exclusions and delivery assumptions.”
An open breakdown helps discussion, but some factories treat detailed wage rates as confidential or quote through standard package prices. A refusal to disclose internal rates is not proof of dishonesty. At minimum, obtain a clear scope, measurable specification, itemized extras and a repeatable change-price mechanism.
Use this calculation to ask better questions. Then compare the answers using Part 2.
Edited from user-supplied manuscripts. Arithmetic checked; time and rate inputs remain illustrative. Unsupported embroidery tariff and 76-fold comparison removed. Judgment rules qualified to avoid inferring capability or honesty from a quotation format.
General sourcing guidance, not verified factory time-study results, a regional wage schedule or a current market quotation. Author biography supplied by the author.
Sources
YOUR NEXT STEP
Put the details to work.
Estimate an order or turn your specifications into a supplier inquiry.